LinkedIn post 27-01-2026
๐๐ถ๐๐ฒ ๐๐ฒ๐ฐ๐ฎ๐ฑ๐ฒ๐ ๐ผ๐ณ ๐๐ฒ๐๐ถ๐ด๐ป๐ถ๐ป๐ด ๐ฆ๐๐๐๐ฒ๐บ๐ ๐ง๐ต๐ฎ๐ ๐๐ฒ๐ฒ๐ฝ ๐ฃ๐ฒ๐ฟ๐ณ๐ผ๐ฟ๐บ๐ถ๐ป๐ด
For more than fifty years, ๐ฉ๐๐ ๐๐ฑ๐๐ถ๐ฒ๐๐ด๐ฟ๐ผ๐ฒ๐ฝ has supported public institutions, growers, investors and research organisations in developing greenhouse and controlled-environment infrastructure designed to perform reliably over the long term.
Projects differ widely in climate, crop type and scale, but the underlying requirement is consistent: systems that meet production targets while operating within clear constraints on energy, water, biosecurity and operational risk.
VEK’s role spans the full project trajectory, from early feasibility and master planning through detailed engineering and delivery support, ensuring that design decisions, technology choices and operating models are aligned from the outset.
The result is a body of work across Europe, the Middle East, Asia and the Americas built on continuity: facilities that continue to perform over time, and partnerships that extend across multiple investment and development cycles.