LinkedIn-Blogpost 20251210
LinkedIn post 10-12-2025 Congratulations to Rijk Zwaan on the opening of the Hybride Phase 2 facility. VEK supported both Phase 1 and Phase 2 with regulatory coordination and the design of the biosecure access and support zone for the new greenhouse area. The work ensured that people, materials and operational flows align with the siteโs […]
LinkedIn-Blogpost 20251129
LinkedIn post 29-11-2025 ๐๐ผ๐ ๐๐จ ๐๐น๐ถ๐บ๐ฎ๐๐ฒ ๐ฃ๐ผ๐น๐ถ๐ฐ๐ ๐๐ ๐๐ต๐ฎ๐ป๐ด๐ถ๐ป๐ด ๐๐ฟ๐ฒ๐ฒ๐ป๐ต๐ผ๐๐๐ฒ ๐๐ฒ๐๐ถ๐ด๐ป EU climate policy is reshaping what a modern greenhouse or controlled-environment facility must achieve. Design briefs that once focused solely on yield now must account for lifetime energy performance, input efficiency, and demonstrable environmental impact. In new projects, five themes are moving earlier in […]
LinkedIn-Blogpost 20251126
LinkedIn post 26-11-2025 For more than five decades, VEK has delivered end-to-end greenhouse design, engineering and build execution for institutions worldwide. Our work spans controlled environment agriculture, floriculture, seed production, and advanced research facilities, each designed for its specific climate, operational context, and long-term performance needs. From feasibility and master planning to detailed engineering, procurement, […]