LinkedIn post 10-12-2025
Congratulations to Rijk Zwaan on the opening of the Hybride Phase 2 facility.
VEK supported both Phase 1 and Phase 2 with regulatory coordination and the design of the biosecure access and support zone for the new greenhouse area.
The work ensured that people, materials and operational flows align with the site’s stringent research and breeding protocols.
This milestone strengthens the infrastructure behind long-term protected cultivation and variety development, and reflects the continuing evolution of high-performance research environments in controlled-environment agriculture.