| Location | Netherlands, Westland |
| Culture | Tomato |
| Greenhouse | 105,000 m2 greenhouses (2003) 80,000 m2 greenhouses (2004) |
| Buildings | 4.000 m2 packing building |
| CHP | 4 gas engines, 8.4 MW-e in 2005; 5th engine of 3.0 MW-e in 2006 |
| Advise | 2002-2004; turnkey |
| Start building | 2003+2004 |
| Start production | 2003+2004 |
Big extension & fast renewal
The existing company of 8 ha was extended with approx. 10 ha to a company of 18 ha in total. Directly after this successful extension, it was decided to renew the existing 8 ha. The result was a complete new modern tomato production company of 18 ha. More renewals and extensions were realized in the next few years.
VEK Adviesgroep was responsible for the design of the hall, office building (toilets, offices, canteen, changing room), greenhouse and its equipment, including boiler room and co-generation installation of 10.2 MWe. VEK Adviesgroep supervised the whole process, including planning, design (architecture), engineering, tendering & contracting.
|