Ghana, agro logistics

Location Ghana, Tema & Accra
Activities Distribution centre in Port of Tema and at Kotoka Airport
Building 4,580 m2 in Tema; 1,400 m2 at Airport
Office
Advise 2005-2012;
feasibility study, design, technical specifications, tendering, project management
Start building 2005 & 2011
Start use 2005 & 2012

Ghana, agro logistics

Development and realization of agro logistic centres to support the export of horticultural products from Ghana to Europe by creating cooling facilities from harvesting to supermarket. It is a long-term project and includes the development of:

  • a distribution centre (DC) in the port of Tema
  • a perishable cargo centre (PCC) at the airport of Accra
  • conditioned sorting & packing facilities at the production locations (FPH = Field Pack House).

The facilities are organized for fruit, vegetables and ornamentals.

In 2005 the distribution centre was built in Tema. In 2010-2012 the PCC in Accra was built. Between 2006 and present various FPH’s are built.

VEK was responsible for supervision until commissioning, including planning, design, engineering, tendering & contracting. Partner Adviesburo Verhoef was responsible for the cooling installations.